"El Refugio" - Construction

To enlarge the thumbnail in place, click and hold down the mouse button.
For a high-resolution view in a new window, click on the magnifier to the right (zoom to 100% to see full details).

21 Oct 2006

Textured Paint with Bóveda

A view from the kitchen showing the textured walls with the bóveda. The only remaining interior texturing downstairs is that waiting for kitchen units to be fitted.

21 Oct 2006

Silicone Treatment of Beams

The I-beams are sanded down and treated with silicone before being repainted with black enamel. The bricks are also sanded down and cleaned with muriatic acid.

21 Oct 2006

Finishing Off Sloping Roof Edges

Concreting of the sloping roofs has now been completed except for the edges.

24 Oct 2006

Painting and Texturing of Beams

The beams in the boveda are now painted black, while the 8x5¼ I-beam is textured white so it effectively disappears.

24 Oct 2006

Start of Floor Tiling

At last work has started on the floor tiles; this is the entrance of the living room. The layout of tiles will be rectilinear on the main areas of the lower floor, and diagonal in the living room and family room.

24 Oct 2006

Gap in Screen Now Filled In

The gap in the screen has now been filled in so that it is no longer see-through.

28 Oct 2006

Subfloor Now Nearly Complete

The firme on the upper floor is now complete except for the master bedroom.

28 Oct 2006

Tiling and Hammered Steps in Living Room

The tiling in the living room is now complete, including grouting and edging (the lower area will have a wooden floor). The steps have been hammered to produce this marbled finish (this is incredibly labor-intensive; each of these steps took nearly two man days). This finish is also being applied to the exterior steps and edge of the covered patio.

28 Oct 2006

Drywall Alcove in Master Bedroom

Drywall has been used to create this structure around the bed in the master bedroom; it reaches the ceiling and imparts a pleasant curvature to the wall.

28 Oct 2006

Tiling and Dining Table

Most of the kitchen and dining area has now been tiled; the table top must be hammered and polished, and the base of the table filled in and done similarly.

28 Oct 2006

Front of House

The front of the house; there has been no exterior texturing yet, and the sides of the sloping roof over the master bedroom still need some work.

02 Nov 2006

Start of Tiling on Flat Roof

The start of tiling on the flat section of the roof.

02 Nov 2006

Dishwasher Fittings

Fittings for a dishwasher have now been installed.

02 Nov 2006

Start of Fitting of Railings

The first of the railings; these must be fitted before the tiles can be laid.

02 Nov 2006

Floor Tiling Downstairs Nearly Done

All the interior downstairs tiles have now been laid and grouted, except for one or two details that must wait for doors to be fitted.

02 Nov 2006

Closet Base in Bedroom 2

The base for the closet in bedroom 2; bases for the two cloakroom closets have already been made. Concrete bases will also be made for closets in the dressing room, bedroom 3, and the laundry room.

02 Nov 2006

Work on Bóveda in Master Bedroom

The master bedroom, with the boveda brickwork being touched up with mortar. The firme (including on the balcony) is now complete.

02 Nov 2006

Tiling on Roof Underway

More clay tiles have now been placed on the roof. These will later be covered with a cement/silicone mixture, then treated with a water-resistant paint. By the tiles is shown the tool used to smooth out the stucco.

03 Nov 2006

Tiling Started on Terrace

Tiling has been started on the rear terrace using a more rustic type of tile.

04 Nov 2006

Tiling on Covered Patio

Most of the covered patio has now been tiled and grouted using the interior tiles.

04 Nov 2006

Tiling in Master Bathroom Shower

Tiling has also been taking place in the shower cubicle of the master bathroom. A compatible non-slip tile has been chosen for the floor.

04 Nov 2006

Treated Bóveda in Bedroom 2

The boveda brickwork and beams in bedroom 2 have now been cleaned and treated.

07 Nov 2006

Even Crazier Improvised Scaffolding

They finally got round to covering these high walls. Each bracket was fixed with one bolt going right through the wall to make this rather precarious platform. Don’t know how they are going to do the overhanging section…

08 Nov 2006

Tiling in the Study

Tiling has been started in bedroom 3, and here in the study. The bedrooms and study will have a diagonal layout, and elsewhere will be rectilinear.

08 Nov 2006

Completely Insane Improvised Scaffolding

Here's how they did that overhanging section!

09 Nov 2006

Flat Roof Areas now Tiled and Sealed

All the flat areas of the roof, including those at the sides of the master bedroom, have now been tiled and covered with impermeabilizante.

09 Nov 2006

Essential Mexican Laundry Apparatus

This is the lavadero – every Mexican home must have one. From the blue marks on the wall and the two large lugs, it seems installation will involve bashing it into the wall…

16 Nov 2006

Shower Cubicle Tiling Done

The shower cubicle has now been completely tiled and grouted.

16 Nov 2006

Installation of Said Apparatus Complete

The lavadero has now been installed and texturing completed; unusually, this one is supported underneath – most are fixed only in the wall behind. A base has been made for the closet and tiling has been completed in the drying patio (awaiting grouting).

16 Nov 2006

Roof Walls Ready for Texturing

All the walls on the roof are now covered with impermeabilizante ready for texturing.

16 Nov 2006

Tiling and Installation of Electrical Fittings

The upstairs sitting area has been tiled diagonally to differentiate it from the surrounding passageway. The power and communication points and light switches are being installed. All communication points will support sockets for telephone, TV/radio antenna and LAN.

16 Nov 2006

Roof Tiles

87 square meters of terracotta tiles have arrived for the sloping roofs.

18 Nov 2006

Wall Tiles around Kitchen Units

Wall tiles have been fitted in between the kitchen units and around the window. There will be textured paint above the units from a height of 2.2 meters upwards.

18 Nov 2006

Installation of Lighting and Fittings

The lighting is now being installed together with the light switches and power/communication points.

18 Nov 2006

Sloping Roofs now Waterproofed

Both sloping roofs have been sealed with a cement/silicone base followed by white impermeable paint, and are now ready for the roof tiles. Textured painting has started in the drying patio and on the walls of the flat roof area.

25 Nov 2006

Railings and Textured Painting

The straight sections (only) of railing have now been fitted. The rooftop walls have all been textured and work is now in progress texturing the entire exterior.

25 Nov 2006

Painting of South Walls now Done

The south side of the house, showing that the texturing of the high walls has been done and the scaffolding has been removed.